For single-component weather-resistant sealant, cold and dry conditions can slow curing.
In general, lower temperature slows the curing reaction, and lower humidity also reduces curing speed.
As a result, surface skinning (tack-free time) and through-cure typically take longer in winter.
For project-critical applications, follow the product TDS and confirm curing progress before exposing the joint to movement, water, or stress.


